The city of Monticello does not require business license to operate a business within the city limits. However, in order to remain compliant with state law and maintain quality of city utilities, the city has several permits required for connection to local utilities as part of the building permit process.

 

The building & utilities permit process is initiated by submitting a Building Permit Application (Including building plans with application can expedite the process). Building permit fees are based on the estimated construction cost of the buildings; see the fee schedule below. After the Building Permit Application is received, the City Engineer will conduct a site inspection. Once the site is approved by the City Engineer, construction can begin.

 

At various stages of the construction process, the building’s electrical, gas, and plumbing will have to be inspected before the building can be occupied or used; see the fee schedule for the various inspections below.

 

Building Permit

$0.00 - $5,000                         $20.00
$5,001 - $10,000                     $20.00 + $3.00 per thousand over $5,000
$10,001 - $50,000                   $35.00 + $2.00 per thousand over $10,000
$50,001 - $100,000                 $115.00 + $1.75 per thousand over $50,000
$100,001 to $200,000             $202.50 + $1.50 per thousand over $100,000
$200,001 +                               $352.50 + $1.00 per thousand over $200,000

State AR Building Permit       $0.05 per $1,000.00 ($1,000.00 maximum)

Slab inspection                        $20.00

 

                                                  Inside City Limits         Outside City Limits

Electrical Permit

Electrical pole                         $30.00

Electrical permit                     estimated based

                                                  on building plans

Gas Permit

Gas Inspection                        $30.00                          $35.00

 

Water & Sewer Permits

Tap out inspection                  $20.00                         $25.00

Plumbing inspection              $30.00                          $35.00

Sewer Tie-in                            $100.00                       $150.00

Sewer Inspection                    $30.00                         $35.00

Water meter

      3/4"                                    $400.00                       $420.00

      1”                                       $500.00                       $520.00

      2”                                       $1075.00                     $1095.00

Fixture fees

First fixture                             $5.00

Per each fixture                      $1.00

Final Inspection                      $20.00                         $25.00

 

Occupancy Permit

Single-Family                          $10.00

Commercial < 2,000 ft2          $20.00

Multi-Family < 2,000 ft2         $30.00

 

Commercial < 2,000 ft2          $40.00

Multi-Family < 2,000 ft2         $50.00

 

LABORSHED

 

MARKET GUIDE

MARKET ACCESS

 
Monticello EDC logo

Proudly created with Wix.com

© 2019 by Monticello Economic Development Commission

295 Airport Rd.

PO Box 1890

Monticello, AR 71657

Phone: 870 367 3076

Follow us for

the latest news

  • Facebook Social Icon